EV Solar Charging Station Supplier & OEM/ODM Infrastructure in Israel

Empowering Israel's Commercial, Fleet, and Public Charging Networks with Tier-1 Solar-Storage-Charging Microgrids & Smart High-Power DC Chargers.

Inquire Israel Market Solutions

Israel Commercial & Industrial EV Solar Microgrids

The State of Israel is undergoing a rapid, policy-driven transition toward sustainable transport and clean energy. Under the targets outlined by the Ministry of Energy, Israel aims to eliminate sales of new gasoline- and diesel-fueled private vehicles by 2030, transitioning entirely to electric vehicles (EVs). Concurrently, the national grid faces significant congestion challenges, particularly in localized regions like the Central District (Tel Aviv-Yafo, Petah Tikva) and southern logistics corridors. To support this massive influx of EVs without triggering grid instability, the deployment of local, decentralised **Solar-plus-Storage-plus-Charging** infrastructure has emerged as the definitive solution.

2030
Zero-Emission Target
300+
Sunny Days Annually
360kW
Ultra-Fast Output
100%
IEC Compliant

Israel's geographic profile is characterized by high solar irradiance levels—exceeding 2,000 kWh/m² annually in the Negev and Arava regions—making solar energy highly productive. Integrating photovoltaic (PV) generation directly with high-power DC fast chargers (60kW to 600kW) allows commercial fleet operators, retail centers, industrial parks, and municipal public charging depots to significantly lower their Levelized Cost of Energy (LCOE) while relieving the load on the Israel Electric Corporation (IEC) distribution network.

Information Gain: Unlike standard grid-tied charging, Hudd Energy’s solar-integrated systems use proprietary dynamic energy management algorithms (EMS) that balance localized PV generation, Battery Energy Storage Systems (BESS), and EV demand, enabling high-performance charging even under severe grid connection bottlenecks.

Strategic Challenges in the Israeli Grid Environment

Establishing charging infrastructure in Israel presents unique challenges. The primary obstacle is the long lead times required to upgrade electrical grid transformers. A commercial site owner seeking to install four 180kW dual-gun chargers (720kW total load) may face grid approval delays ranging from 12 to 24 months. Furthermore, Israel's peak demand periods coincide with extreme summer temperatures, leading to high air conditioning loads and potential grid stability issues.

By implementing an on-site Solar-Storage-Charging system, commercial clients can bypass these constraints. The battery system acts as a buffer, storing solar energy generated during daytime hours and discharging it to vehicles during peak demand. This process, known as peak shaving, reduces the required grid connection capacity and allows facilities to avoid high peak-demand tariffs set by the Electricity Authority.

Technological Roadmap: V2G, Liquid-Cooling, and Multi-Standard Systems

At Guangdong Hudd Energy Co., Ltd., we align our technical roadmap with international standards and localized regional demands. As a leading EV Solar Charging Station Supplier, we design systems that incorporate the latest technological innovations to ensure long-term usability and high return on investment.

Dynamic Power Allocation

Our intelligent 120kW to 600kW split-type chargers dynamically allocate power to individual charging modules. When two vehicles charge simultaneously, the system adjusts power flow based on battery status, minimizing charging times and maximizing equipment utilization.

Vehicle-to-Grid (V2G) & V2X

Future energy systems will rely on bi-directional power flow. Our hardware architectures are V2G-ready, allowing EV fleets to function as mobile energy storage systems, supplying energy back to local building systems or the grid during high-demand periods.

Liquid-Cooled Supercharging

To support high-voltage architectures (800V+) used in modern EVs, we provide liquid-cooled superchargers capable of delivering up to 600kW. Liquid cooling reduces charging cable weight and manages thermal performance during high-capacity charging cycles.

Thermal Performance in Desert Environments

The high summer temperatures in Israel, particularly in regions like Beer Sheva, Eilat, and the Jordan Valley, require advanced thermal management for electrical enclosures. Standard chargers often experience thermal derating at ambient temperatures above 40°C, reducing output capacity precisely when demand is highest.

Hudd Energy's charging stations utilize double-compartment designs and cooling configurations that isolate sensitive power modules from external dust and sand while maintaining internal temperatures within safe limits. This ensures our chargers operate at rated capacity at temperatures up to 50°C, protecting key components and extending operational life.

Global Sourcing, Logistics & Compliance Standards

Global procurement teams face complex challenges when sourcing charging infrastructure, including verifying compliance with regional regulations, ensuring grid integration compatibility, and securing reliable delivery timelines. Guangdong Hudd Energy Co., Ltd. addresses these challenges through structured end-to-end support, from factory testing to international logistics and field commissioning.

IEC 61851 & CE Compliance

Our charging systems conform to international safety regulations, including IEC 61851-1, IEC 61851-23, and IEC 62196. We work closely with leading testing institutions to ensure smooth approval processes with the Standards Institution of Israel (SII).

OCPP 1.6J & 2.0.1 Integration

Our products feature open communication protocols, allowing seamless integration with regional charging management systems, billing engines, and grid demand-response platforms.

Supply Chain & Financial Support

Through partnerships with financial institutions and reliable shipping networks, we offer flexible trade finance options (L/C, T/T, etc.) and complete logistics services for customs clearance in Israel.

Advanced Manufacturing & Quality Assurance

Under strict ISO9001:2015 and Tier-1 automotive-grade quality control, our production line handles advanced welding, wiring, and thermal testing to ensure reliable operation in field environments.

Laser Spot Welding Laser Spot Welding
Cutting Wire Cutting Wire
Connect the Wires Connect the Wires
Charging Charging Test
Storage Storage & Aging Area
Laser Spot Welding Machine Laser Spot Welding Machine
Spot Welding Machine Spot Welding Machine
Electric Soldering Iron Precision Manual Soldering
Terminal Crimping Machine Terminal Crimping Machine

Guangdong Hudd Energy Co., Ltd. is a professional provider of renewable energy products, energy storage solutions, and integrated smart energy systems. The company specializes in the development, supply, and integration of advanced energy storage systems (ESS), solar power solutions, EV charging infrastructure, and integrated solar-storage-charging stations, delivering efficient, reliable, and sustainable energy solutions to customers worldwide.

Beyond supplying individual products, Hudd Energy offers comprehensive system integration services tailored to diverse project requirements. Leveraging extensive industry expertise, the company provides end-to-end support covering solution design, equipment selection, system integration, project management, commissioning, and after-sales services. This enables customers to implement optimized energy solutions with enhanced efficiency, performance, and long-term reliability.

With strong partnerships across China's manufacturing ecosystem, Hudd Energy benefits from a robust and competitive supply chain, ensuring high-quality products, stable delivery schedules, and cost-effective solutions. The company also maintains strategic cooperation with financial institutions and banking partners, providing flexible trade finance support and secure transaction services to facilitate the successful execution of international projects.

Hudd Energy's product portfolio serves a wide range of applications, including residential, commercial, industrial, utility-scale energy storage projects, electric vehicle charging networks, and distributed renewable energy systems. The company is committed to helping customers reduce energy costs, improve energy independence, and achieve their sustainability goals.

Over the years, Guangdong Hudd Energy has successfully expanded its presence in international markets, particularly in Southeast Asia, South America, the Middle East, and Africa, earning the trust and recognition of clients through reliable products, professional services, and long-term partnerships.

Looking ahead, Guangdong Hudd Energy Co., Ltd. will continue to drive innovation in clean energy technologies, strengthen its global market presence, and contribute to the worldwide transition toward a greener, smarter, and more sustainable energy future.

Industrial & Commercial Solar EV Charging Product Portfolio

Explore our full line of EV charging hardware, ranging from compact AC destination chargers to multi-megawatt split-type DC superchargers.

Israel Market EV Charging FAQ

Answers to common technical, regulatory, and logistics questions about implementing EV charging infrastructure in Israel.

What charging standards and connectors are required for the Israel market?
Israel officially aligns with European standards. For AC charging, Type 2 (Mennekes) connectors are standard. For DC fast charging, CCS2 (Combined Charging System 2) is the standard interface. All of our commercial charging systems are available with native CCS2 configurations, meeting local regulatory requirements.
How does Hudd Energy support the Standards Institution of Israel (SII) certification process?
All our charging hardware is CE certified and tested according to relevant IEC standards (including IEC 61851 and IEC 62196). We provide complete documentation packages, including laboratory test reports, EMC reports, and declaration documents, to assist local partners with the SII approval process.
Can the chargers be integrated with third-party billing and management platforms?
Yes. Our chargers support OCPP 1.6J and OCPP 2.0.1. This allows connection to third-party charging management networks, municipal platforms, or fleet management software used in Israel. Communication is supported via RJ45 Ethernet, Wi-Fi, or integrated 4G modules.
How do Hudd Energy systems perform in high-temperature environments like the Negev?
Our outdoor charging stations are designed to operate in high ambient temperatures. They feature IP54 or IP65 sealed enclosures, dual-ventilation designs, and intelligent thermal sensors. The system reduces power output gradually (smart derating) only at extreme internal temperatures, maintaining safe operation without sudden shutdowns.
What is the typical lead time for shipping to the Port of Ashdod or Port of Haifa?
Standard manufacturing lead times range from 20 to 30 days depending on order volume and level of customization. Ocean transit from Shenzhen/Guangzhou ports to Ashdod or Haifa typically takes 25 to 35 days, depending on route conditions. We provide tracking and logistics support throughout the shipping process.